Case Study / Commercial

Jaguar Land Rover Design and Engineering Centre

CJ Joinery Contracts were appointed on a labour-only basis on Jaguar Land Rover's new £200 million Design and Engineering Centre in Gaydon to install the Cat B fit-out joinery.

Gaydon, Warwickshire
Commercial
Project Highlights

What set this project apart

01 / 05

Handed over 4 weeks ahead of programme

02 / 05

Labour-only installation package

03 / 05

3 bespoke Corian reception desks installed

04 / 05

30 tea points and kitchens installed

05 / 05

250m² of feature wall panelling

Scope of Works

Our delivery on site

CJ Joinery Contracts delivered the following packages of work across this project.

  • Installation of bespoke solid surface reception desks and display cabinets
  • Installation of feature acoustic wall panelling
  • Installation of bespoke tea points and kitchens (30 units)
  • Installation of over 400 fan coil covers and bookcases
  • Installation of 250m² of feature wall panelling
  • Installation of 3 bespoke Corian reception desks
The Challenge

What we were up against

The biggest challenge on this project was the logistics of taking deliveries and moving them efficiently to where they needed to be on a live £200 million construction site.

Our Solution

How we delivered

We overcame this by making sure every delivery was booked in with the main contractor and arrived on the correct pallets so materials could be distributed easily around the site. Communication was the key to keeping this efficient and everyone on the same page. We consider this one of our flagship projects due to the prestige and profile of the scheme, and it gave us a real chance to prove our capabilities in high-end commercial joinery packages.